![]() |
Hot Air Blower connected to Coating pan |
SOP For Hot Air Blower
Standard Operating Procedure for Electric Hot Air Blower.
1.00 Purpose
The purpose of
this SOP is to develop a standard procedure for operating the Electric
hot air Blower.
2.0 Scope
This SOP is applicable
for the Hot Air Blower of conventional coating pans used in the tablet coating
area of the production section.
3.0 Responsibility
3.1 Machine Operator
is responsible for operating the Electric Hot Air Blower.
3.2 Production
Pharmacist is responsible for the implementation of this Standard Operating
Procedure.
3.3 The Head Of
Production is responsible for ensuring the implementation of the current
SOP.
3.4 Quality Assurance
Officer monitors the compliance of this SOP.
4.0 Procedure
4.1 Pharmacist shall
ensure that the Hot Air Blower, coating pans & the area are properly
cleaned.
4.2 Production
Pharmacist shall ensure that the line clearance is awarded & product labels
are attached to the area & equipment.
4.3 Bring Hot Air
Blower near the coating pan & Adjust the position of the hot air supplying
pipe according to the tablet bed position.
4.4 Insert the wire
plug of the Hot air Blower into the socket & press the On button to start
the air blower.
4.5 Turn On the
heaters of the hot air Blower and adjust the temperature According to BMR.
4.6 Start Spraying
& complete the coating process according to BMR.
4.7 At the end of the
coating process turn the heaters Off then turn off the blower & remove the
wire plug.
4.10 Attach hot air
Blower
'To be cleaned'
label,record the activity in the logbook of the Hot air Blower and sign it.
5.0 Abbreviations
5.1 SOP: Standard
Operating Procedure
5.2 BMR: Batch
Manufacturing Record
5.3 QA: Quality
Assurance
5.4 HOP:Head Of
Production
0 Comments