Calibration of Disintegration
Test Apparatus
Calibration of Disintegration
Test Apparatus
¨ To
Calibrate Disintegration Test Apparatus following parameters should be
considered
¨ Number
of Cycles per Minute
¨ Calibration
of Temperature
¨ Calibration
of the Distance Travelled
¨ Timer
Calibration
¨ Sieve
Integrity Test
Number of Cycles Per Minute
¨ Switch
on the instrument and check if the instrument is ready for operation proceed
further for calibration of number of cycles per minute.
¨ Take
a pre-calibrated stopwatch.
¨ Operate
the instrument as per the approved SOP.
¨ Start
the instrument and stopwatch simultaneously.
¨ Record
the number of cycles manually with respect to time and record the data.
¨ Instrument
shouldn’t be stop in between the operation.
¨ Carry
out the operation for a total of 6 times.
Start time |
End time |
Observed Cycles per minute |
Acceptance Criteria |
|
Basket A |
Basket B |
|||
0 |
5 |
29—32
Cycles per minute |
||
15 |
20 |
29—32
Cycles per minute |
||
30 |
35 |
29—32
Cycles per minute |
||
45 |
50 |
29—32 Cycles per minute |
||
60 |
65 |
29—32 Cycles per minute |
||
75 |
80 |
29—32 Cycles per minute |
Calibration for Temperature
¨ Switch
on the instrument and press the heater button on to keep the heater on.
¨ Set
the temperature at 37◦c.
¨ Fill
the beakers with water and operate the instrument as per SOP so that the basket
rack assembly starts oscillation.
¨ Place
a pre-calibrated thermometer in one of the tube of basket rack assembly and
wait till the temperature reach up to 36-38◦c.
¨ Now
start recording the temperature of both the baskets initially and for every 15
minutes up to 2 hours.
¨ After
placing the thermometer in the basket wait for 2 to 3 minutes so that the
reading become stable and then record the data.
¨ During
recording the temperature don’t place the thermometer constantly in the basket,
after recording data remove thermometer from the basket.
Time (Minutes) |
Temperature of
Basket A |
Temperature of
Basket B |
Acceptance Criteria |
Initial |
37± 1◦c |
||
15 |
37± 1◦c |
||
30 |
37± 1◦c |
||
45 |
37± 1◦c |
||
60 |
37± 1◦c |
||
75 |
37± 1◦c |
||
90 |
37± 1◦c |
||
105 |
37± 1◦c |
||
120 |
37± 1◦c |
Calibration of Distance
Travelled
¨ Switch
on the instrument and keep the instrument in a condition where the basket rack
assembly is positioning on its highest point.
¨ Now
place a white paper parallel to the arm of the basket rack assembly and draw a
mark on its highest position with the help of a pointer pen.
¨ Start
the instrument by pressing the start button so that the basket rack assembly
reach to its lowest position.
¨ Keenly
observe that is the basket rack assembly is at lowest position if it is so then
mark the point with a pointer pen.
¨ Now
measure the distance between the two points with a calibrated ruler.
¨ Perform
the test 3 times i.e initially then at 60 and 120 minutes.
¨ Procedure
should be performed separately for both the baskets A and B.
Time |
Distance travelled by Basket A |
Distance travelled by Basket B |
Acceptance Criteria |
Initial |
53– 57mm |
||
60 minutes |
53– 57mm |
||
120 minutes |
53– 57mm |
Timer Calibration
¨ Switch
on the instrument and check that is the instrument ready to be operate.
¨ Set
the timer of the instrument “30” minutes.
¨ Now
start the instrument and pre-calibrated stop watch simultaneously.
¨ Keenly
observe the time on stop when the instrument stop.
¨ Record
the data.
¨ Repeat
the procedure for 3 times.
Acceptance Criteria
¨ Timer
should not deviate ±1 minut
Sieve Integrity Test
¨ Check the integrity of the sieve attached to
the base of the plate with the help of pre-calibrated vernier caliper.
¨ Aperture of the squares of the sieve should
be within the limit of 1.8 to 2.2mm.
¨ Diameter of the wire should be within the
limit of 0.57 to 0.66mm.
If the
instrument was found to have all the parameters within the acceptance criteria
it should be tagged as “Calibrated”.
In case of
failure of any parameter the concerned person should be informed.
0 Comments