¨  To Calibrate Disintegration Test Apparatus following parameters should be considered

¨  Number of Cycles per Minute

¨  Calibration of Temperature

¨  Calibration of the Distance Travelled

¨  Timer Calibration

¨  Sieve Integrity Test

Number of Cycles Per Minute

¨  Switch on the instrument and check if the instrument is ready for operation proceed further for calibration of number of cycles per minute.

¨  Take a pre-calibrated stopwatch.

¨  Operate the instrument as per the approved SOP.

¨  Start the instrument and stopwatch simultaneously.

¨  Record the number of cycles manually with respect to time and record the data.

¨  Instrument shouldn’t be stop in between the operation.

¨  Carry out the operation for a total of 6 times.

Start time

End time

Observed Cycles per minute

Acceptance Criteria

Basket A

Basket B

0

5

29—32 Cycles per minute

15

20

29—32 Cycles per minute

30

35

29—32 Cycles per minute

45

50

29—32 Cycles per minute

60

65

29—32 Cycles per minute

75

80

29—32 Cycles per minute

 

Calibration for Temperature

¨  Switch on the instrument and press the heater button on to keep the heater on.

¨  Set the temperature at 37◦c.

¨  Fill the beakers with water and operate the instrument as per SOP so that the basket rack assembly starts oscillation.

¨  Place a pre-calibrated thermometer in one of the tube of basket rack assembly and wait till the temperature reach up to 36-38◦c.

¨  Now start recording the temperature of both the baskets initially and for every 15 minutes up to 2 hours.

¨  After placing the thermometer in the basket wait for 2 to 3 minutes so that the reading become stable and then record the data.

¨  During recording the temperature don’t place the thermometer constantly in the basket, after recording data remove thermometer from the basket.

Time (Minutes)

Temperature  of Basket A

Temperature  of Basket B

Acceptance Criteria

Initial

37± 1◦c

15

37± 1◦c

30

37± 1◦c

45

37± 1◦c

60

37± 1◦c

75

37± 1◦c

90

37± 1◦c

105

37± 1◦c

120

37± 1◦c

 

Calibration of Distance Travelled

¨  Switch on the instrument and keep the instrument in a condition where the basket rack assembly is positioning on its highest point.

¨  Now place a white paper parallel to the arm of the basket rack assembly and draw a mark on its highest position with the help of a pointer pen.

¨  Start the instrument by pressing the start button so that the basket rack assembly reach to its lowest position.

¨  Keenly observe that is the basket rack assembly is at lowest position if it is so then mark the point with a pointer pen.

¨  Now measure the distance between the two points with a calibrated ruler.

¨  Perform the test 3 times i.e initially then at 60 and 120 minutes.

¨  Procedure should be performed separately for both the baskets A and B.

Time

Distance travelled by Basket A

Distance travelled by Basket B

Acceptance Criteria

Initial

53– 57mm

60 minutes

53– 57mm

120 minutes

53– 57mm

 

Timer Calibration

¨  Switch on the instrument and check that is the instrument ready to be operate.

¨  Set the timer of the instrument “30” minutes.

¨  Now start the instrument and pre-calibrated stop watch simultaneously.

¨  Keenly observe the time on stop when the instrument stop.

¨  Record the data.

¨  Repeat the procedure for 3 times.

Acceptance Criteria

¨  Timer should not deviate ±1 minut

Sieve Integrity Test

¨  Check the integrity of the sieve attached to the base of the plate with the help of pre-calibrated vernier caliper.

¨  Aperture of the squares of the sieve should be within the limit of 1.8 to 2.2mm.

¨  Diameter of the wire should be within the limit of 0.57 to 0.66mm.

If the instrument was found to have all the parameters within the acceptance criteria it should be tagged as “Calibrated”.

In case of failure of any parameter the concerned person should be informed.

 

 

 