User Requirement Specifications

 



User Requirement Specifications

User Requirement Specifications

¨  User Requirement Specifications (URS): User requirements specifications is a complete list of the necessities from the user, that is provided to the manufacturer to get the desired material that fall within the acceptable criteria.

¨  User requirements specifications are prepared for system, equipment and utilities where applicable.

¨  Verification of URS is required at later stage to confirm that is the purchased or supplied system, utility or equipment is fall within the criteria that is required for the intended purpose and the specifications given by the supplier .

¨  Providing URS to the manufacturer following points should be considered.

¨  Introduction: Instrument, equipment & system should be properly introduced in written form.

¨  Purpose: Purpose for which the instrument, equipment & system is to be installed should be briefly defined.

¨  Scope: Scope of the instrument, equipment or system will be write down.

¨  Safety: Safety protocols will be explained briefly.

¨  Abbreviations: Abbreviations used will be written.

¨  References: References of the compendial books or guidelines will be provided in written.

¨  Overview: This section will include following aspects

¨  Intended Use: Use of the equipment, instrument or system in the manufacturing.

¨  Location: Location where equipment, instrument or system to be installed.

¨  Other areas of impact: Specify other areas that are to be impacted.

¨  Capacity: Capacity of instrument, equipment       or system should be defined.

¨  Construction material: Details of the material that is used in construction like metal, SS etc

¨  Accuracy: Accuracy of the instrument, equipment or system should be defined.

¨  Calibration: Write down is calibration requirements.

¨  Cleaning requirements & Schedule: Cleaning requirements and schedule should be explained briefly.

¨  Utility: Write down utility requirements.

¨  Operation procedure: Operation procedure should be provided here.

¨  Approval:

 

Prepared by

Name & Designation

Date

Signature

Reviewed by

Approved by

Authorized by








Presented by

Muhammad Atif

PhD Scholar Pharmaceutical Sciences

Abdul Wali Khan University Mardan, Pakistan 

Post a Comment

0 Comments