Fitz Mill |
SOP For Fitz Mill
Standard Operating Procedure for Fitz Mill
1.0 Purpose
The purpose of the
current SOP is to develop a standard procedure for operating the Fitzpatrick
mill.
2.0 Scope
This SOP is applicable
for the Fitz mill in the granulation area of the production section.
3.0 Responsibility
3.1 Machine Operator
is responsible for operating the Fitz Mill.
3.2 Production
Pharmacist is responsible for the implementation of this SOP.
3.3 The HOP is
responsible for ensuring the implementation of the current SOP.
3.4 Q.A Officer
monitors the compliance of this SOP.
4.0 Procedure
4.1 Pharmacist will
ensure that the Fitzpatrick Mill & the area is properly cleaned.
4.2 Pharmacist will
ensure that the Fitz mill & Area is labeled with Cleaned label
status.
4.3 Before starting
the working of a Fitz mill, affix product-related labels to the Fitzpatrick
mill & Area and take line clearance from the QA officer.
4.4 The mesh or sieve
to be used for Fitz mill is verified by the pharmacist.
4.5 Attach a polythene
or place a container to the lower side of the Fitz mill to collect the sieved
granules or sieved material.
4.6 Add dried granules
or material to be sieved in the hopper of the Fitz mill and start its working
by pressing the ON button.
4.7 When the sieving process
is completed, press the off button and remove the polythene bag to check the
weight of the granules to calculate the product yield.
4.8 Affix Fitz mill to
be cleaned, label and record the activity in the logbook of the Fitz mill and
sign it.
5.0 Abbreviations
5.1 SOP: Standard
Operating Procedure
5.2 BMR: Batch
Manufacturing Record
5.3 QA: Quality
Assurance
5.4 HOP:Head Of
Production
0 Comments