1.0 Purpose
The purpose of this
SOP is to establish a standard procedure for operating the coating pan system
2.0 Scope
This SOP will be
applicable for the tablet coater in the coating area of the production section.
3.0 Responsibility
3.1 Machine Operator
is responsible for operating the tablet coater.
3.2 Production
Pharmacist is responsible for the implementation of this SOP.
3.3 HOP is responsible
to ensure the implementation of this SOP.
3.4 Quality Assurance
Officer monitors the compliance of this SOP.
4.0 Procedure
4.1 Production
Pharmacist will ensure that the tablet coater, its components and the area are properly
cleaned.
4.2 Production
Pharmacist will ensure that the tablet coater, its components and Area are
labelled with Cleaned label status.
4.3 Before line
clearance, ensure that the spray guns & air pipes are properly installed.
4.4 Take line clearance
from the production officer & quality assurance inspector.
4.5 After line
clearance, prepare a coating solution according to the procedure mentioned in
BMR.
4.6 While the coating
solution is under mixing, add tablets to the coater by opening the charging
door of the coater.
4.7 Enter product name
& batch number to the HMI & Load the recipe or manually add the
following parameters,
·
Inlet Air Temperature
·
Air Flow Volume
·
Atomization Air
Pressure
·
Tablet Bed Temperature
·
Peristaltic Pump Speed
·
Exhaust Air Value
·
Pan Speed or Pan rpm
4.8 Open the exhaust
and deduct the tablet by operating the pan in jogging mode.
4.9 Now Open the
heating & inlet airflow system and preheat or warm the tablets according to
the BMR.
4.10 Check the average
weight of 100 core tablets and the hardness of 10 tablets before starting the
coating process.
4.11 Adjust the
distance between spray guns & moving tablet bed.
4.12 Meanwhile the
coating suspension is ready and starts coating operation by adjusting the
atomization air pressure, spray pattern,pan speed and peristaltic pump speed.
4.13 The coating
parameters are adjusted according to BMR until all the coating suspension is
used.
4.14 Check the average
Weight of 100 tablets to ensure that our target weight is achieved.
4.15 Turn off the
peristaltic pump and atomization air pressure, dry the tablets according to
BMR.
4.16 Turn off the
heating system & ensure temperature normalization of tablets.
4.17 When tablet
temperature is normal, discharge the tablets in containers.
4.18 Again weigh the
average weight of 100 tablets & also check the bulk weight of the whole
coated batch.
4.19 Calculate yield
and store the coated batch in a storage area.
4.20 Record the
activity in the logbooks.
5.0 Abbreviations
5.1 SOP: Standard
Operating Procedure
5.2 rpm: Rounds
per minute
5.3 BMR: Batch
Manufacturing Record
5.4 QA:
Quality Assurance
5.5 HOP: Head Of
Production